top of page
Produzione linee assemblaggio per realtà industriali

Production of assembly lines for industrial realities​

Automated solutions for locks

Double cylinder pre-assembly line for locks

  • Stations: 9

  • Assembled components: 11

  • Assembled models: 25-30-35-40-40 front and rear

  • Operators: 1

  • Hourly production: 750 pcs / h

  • Format change: automatic

Linea di preassemblaggio a cilindri doppi per serrature

Line for assembly and control of locks

  • Stations: 7

  • Feeding: automatic through vibratory feeders and elevators

  • Linear with free pallets

  • Station 1 component loading manual

  • Station 2 component loading manual

  • Hydraulic crimping station

  • Electronic control cam station for handles

  • Electronic control tab cam station

  • Brushless motorized control station

  • Unloading station

  • Finished product accumulation line

Linea per montaggio e controllo serrature

Production 850 pieces / h
Number of operators 1

Automated solutions with rotary tables

Rotating table for assembling hinges for doors and windows

  • Stations: 5

  • Assembled components: 2

  • Feeding: automatic through vibratory feeders and hoppers

  • Automatic box change

  • Hourly production: 2000 pcs / h

Tavola rotante per assemblaggio cerniere per serramenti

Furniture hinges

  • Stations: 6

  • Assembled components: 4

  • Feeding: automatic through vibratory feeders and hoppers

  • Automatic box change

  • Hourly production: 2200 pcs / h

Cerniere per mobili

Chain Link Boards

  • Stations: 12

  • Assembled components: 8

  • Feeding: automatic through vibratory feeders and elevators

  • Hourly production: 2100 pcs / h

Tavole maglie catena

Pins and Rollers Table

  • Stations: 6

  • Assembled components: 3

  • Feeding: automatic through vibratory feeders and elevators

  • Hourly production: 2600 pcs / h

Tavola perni e rulli
automazione-e-robotica--r4--cisano-bergamasco-0027.jpg

Linear mounting units

Variable pitch chain assembly unit

  • Linear machine for chain assembly, with variable pitch fins

Configuration

  • Unit of step

  • Jersey positioning unit

  • Mesh closure unit

  • Production 1200 pieces / h

  • Number of operators 1

Unità per montaggio a catena passo variabile

Bearing assembly line

  • Feeding: automatic through vibratory feeders and elevators

Configuration

  • Linear with free pallets

  • Shaft loading station

  • Ring loading station

  • Lower ring loading station

  • Ball station

  • Upper ring station

  • Orbital riveting station

  • Control station

  • Lubrication station

  • Unloading station

Linea per assemblaggio cuscinetti

Production 1200 pieces / h
Number of operators 0/1

Bearing assembly line

  • Stations: 9

  • Feeding: automatic through vibratory feeders and elevators

Configuration

  • Linear with free pallets

  • Lower link loading station

  • First conveyor loading station

  • Second conveyor loading station 

  • Upper link loading station

  • Orbital riveting station

  • Cotter pin assembly station

  • Control station

  • Lubrication station

  • Unloading station

Linea robotizzata montaggio maglie per catene

Production 900 pieces / h
Number of operators 0/1

Linee robotizzate

Milling unit

Barrel milling unit

  • Workable barrel models: 25-30-35-40-45-50-55-60

  • Channel orientation station

  • Milling head

  • Vice hydraulic handling station

  • Feeding: automatic through vibratory feeder and hopper

  • Hourly production: 800 pcs / h

Unità di fresatura barilotti

Tip milling unit

  • Workable models: 3

  • Milling head

  • Vice hydraulic handling station

  • Feeding: automatic through vibratory feeder and hopper

  • Hourly production: 1200 pcs / h

Unità di fresatura puntuali

Pin machining unit

Pin machining unit

Stations: 8
Workable models: 18

Transfert with rotating table

Loading station

Center hole station

Drilling station

Flaring station

Key planes milling station

Threading station

Control station

Unloading station

Unità di lavorazione perni

Power supply: automatic via

vibratory feeder and hopper
Hourly production: 870 pcs / h

Block drilling and boring unit

Stations: 6
Workable models: 8
Transfert with rotating table

Loading station with orientation

  • Boring station

  • Workpiece rotation station

  • Boring station

  • Control station

  • Unloading station

Unità foratura e alesatura Blocchetti

Feeding: automatic through vibratory feeder and hopper
Hourly production: 560 pcs / h

asset8 (1).jpeg

Discover the performance of the assembly lines, contact our technicians today.

bottom of page